Alliance Privilege - Marriott Hotel


Batumi, Georgia

Client: Alliance Privilege LLC / Alliance Group

 

Consultant: GIPN LLC


Scope of Works:

Foundation Works:

  • 9,300.00 m foundation piles with skin grouting and dimaterer of 1180 mm, max. pile length up to 50.00 m. 
  • 1 nos of Test pile with skin grouting and dimaterer of 1180 mm, max. pile length up to 50.00 m. 
  • 4 nos of Reaction piles with skin grouting and dimaterer of 1180 mm, max. pile length up to 55.00 m. 
  • 2,200 ton pile load test

Shoring Wall Works:

  • 4,300.00 m secant pile wall with diameter of 1200 mm, max pile length up to 18.00 m.
  • 3,000.00 m temporary ground anchors with diameter of 133 mm, max anchor length 20.00 m.
  • 270.00 m water well with diameter of 1200 mm.


Construction Period:

January 2018 - September 2018